Isokolo, Limbe, SWR, Cameroon info@enseengineering.com +237 6 80 67 22 50
PROJECT DETAILS

30MVA Substation Installation

Limbe   |   2026

30MVA Substation Installation

Project Overview


Location: Limbe

Year: 2026

The successful completion of a 30MVA substation installation project. The project involved the full engineering, procurement, construction, installation, and commissioning of a high-capacity electrical substation designed to support efficient power distribution and improve grid stability.

The scope of work included installation of power transformers rated at 30MVA, high-voltage switchgear, circuit breakers, protection and control systems, busbars, isolators, and associated auxiliary equipment.

The completed substation significantly enhances power quality, increases distribution capacity, and improves the reliability of electricity supply to the served region.
Need a quote?
Chat with us!